How Much Does Concrete Removal Cost in Florida?
One national home-improvement cost guide prices concrete removal at $2 to $6 per square foot. That rate covers labor and dumping fees, but not new concrete. The guide puts the national average at $1,139, based on 1,330 verified projects. Most homeowners in its data paid $542 to $1,744.
A second national cost guide prices removal by the project. It puts a concrete driveway at $1,200 to $4,500 on average. A 10 x 10 slab runs $300 to $800, and a 20 x 20 patio runs $1,200 to $3,000. A 50-foot sidewalk runs $750 to $1,250, and concrete steps run $250 to $500.
These are market numbers, not our price list. Superior Concrete and Construction does concrete removal for driveways, slabs and pads, patios, sidewalks, steps and barn floors. We work across Marion County and about 50 miles around Ocala.
Why Do the Two Cost Guides Give Different Numbers?
The two guides measure different things. The first prices removal by the square foot and reports what homeowners paid on average. The second prices whole jobs, such as a driveway or a set of steps. A whole driveway is more concrete than a small slab or a short walk, so its price runs higher.
Run the square-foot rate against a real size, and the guides come close. For 400 square feet, the first guide lists $800 to $2,400. The second guide’s 20 x 20 patio, also 400 square feet, runs $1,200 to $3,000. Those two ranges overlap from $1,200 to $2,400.
On small jobs the second guide runs a little higher. Its 10 x 10 slab works out to $3 to $8 per square foot. The first guide’s 100-square-foot row works out to $2 to $6.
What Does Concrete Removal Cost by Project?
The second guide lists these removal prices by project. Its driveway row shows both the full range and the average.
| Project | Size in the guide | National cost to remove |
|---|---|---|
| Driveway | Single- to double-car width | $1,200 to $8,600, with $1,200 to $4,500 on average |
| Slab | 10 x 10 ft, or 100 sq ft | $300 to $800 |
| Patio | 20 x 20 ft, or 400 sq ft | $1,200 to $3,000 |
| Sidewalk | 50 ft long | $750 to $1,250 |
| Steps | Not listed | $250 to $500 |
The same guide says a patio attached to the house costs more to remove. A barn floor or an old equipment pad prices like any other slab. Its size and thickness set the number, along with any steel inside.
What Does Concrete Removal Cost by Size?
The first guide prices removal by size, for concrete 3 to 6 inches thick. The example dimensions are ours, added for scale.
| Square feet | Example dimensions | National cost to remove |
|---|---|---|
| 100 | 10 x 10 ft | $200 to $600 |
| 400 | 20 x 20 ft | $800 to $2,400 |
| 600 | 20 x 30 ft | $1,200 to $3,600 |
| 1,000 | 20 x 50 ft | $2,000 to $6,000 |
Each row is the $2 to $6 rate multiplied by the square feet. To run your own job, multiply the length by the width. A 12 x 40 driveway is 480 square feet, which works out to about $960 to $2,880 at that rate.
What Moves the Price of Concrete Removal?
Thickness and steel. The first guide’s table covers concrete 3 to 6 inches thick. A thicker slab is more concrete to break up and haul away. The first guide puts reinforced concrete, with rebar or wire mesh, at about $6 per square foot or more. The second guide says reinforcement adds $1 to $3 per square foot for cutting and disposing of the rebar.
Access for the machine. We load broken concrete with a skid steer. Where a machine cannot reach the slab, more of the breaking and loading happens by hand. That takes longer, and the extra time shows up in the price.
Hauling and dump fees. The first guide’s square-foot rate includes dumping. The second guide lists hauling and dumping at $30 to $65 per pickup truck load. It puts dump fees at $90 to $160 per ton, depending on local landfill policy. Marion County’s own rule on concrete is in the next section.
Per-ton pricing on big slabs. The first guide says some contractors charge by the ton instead of by the square foot on large slabs. If you compare two estimates, check that both use the same unit.
City or rural. The first guide says urban contractors charge more than rural ones. It puts city-market rates at $6 to $14 per square foot, well above its $2 to $6 national rate.
Where Does Broken Concrete Go in Marion County?
Marion County Solid Waste lists concrete among the items it no longer accepts. The County’s recycling centers also turn away concrete and construction or demolition waste. Broken concrete from a driveway or patio has to go somewhere else.
Florida law counts uncontaminated concrete as clean debris, even with pipe or steel embedded in it. State law lets clean debris be used as fill without a solid waste permit. Other required permits still apply. Clean debris that is not used as fill still has to be disposed of properly.
Florida law also lists concrete as construction and demolition debris. The County’s solid waste page lists facilities in Marion County that accept that kind of debris.
What Should a Concrete Removal Estimate Spell Out?
Line up two estimates side by side before you choose. Check whether each one prices by the square foot or by the ton. Check whether it assumes steel in the slab, since steel moves the number in both guides.
Ask whether hauling and dump fees are in the total, and where the broken concrete will go. If a new slab follows, ask whether regrading the base is in the price.
What Does It Cost to Tear Out and Replace Concrete?
When new concrete follows the removal, the second guide prices the whole job. It puts tearing out and replacing a slab at $8 to $18 per square foot. At that rate, 400 square feet runs about $3,200 to $7,200.
The new pour has its own price drivers, such as the base and the thickness. Our concrete driveway cost guide and concrete slab cost guide price the new concrete on its own.
Removal and the new pour can be one job. The old driveway is broken out and hauled off, and the base is regraded and compacted. Then we pour a new concrete driveway on that base.
An old patio or pool deck comes out the same way before we pour the new one. See concrete patios and pool decks.
Plan for one more step before work starts. Florida law requires notice through the state’s call-before-you-dig system before any excavation or demolition. It has to go in at least two full business days ahead, and the number is 811. Utilities with lines nearby then mark their routes on the ground.
How Do You Get a Real Price for Concrete Removal?
A real number starts with a look at the concrete. Its size and thickness set how much has to come out. The steel inside, the access for the machine, the hauling and any new pour set the rest.
Our free on-site estimate spells out what comes out and where the debris goes. See how our concrete removal works, or call or text (352) 286-7836.